RAAF Darwin LIA Buildings BMS Refurbishment

Electrical & Mechanical BMS Refurbishment

Project Snapshot

Forty Living-In Accommodation (LIA) buildings at RAAF Darwin required a complete building management system (BMS) refurbishment to meet current Defence standards and operational requirements.

TEC delivered a full end-to-end BMS upgrade, including the design, supply, installation, programming, and commissioning of fourteen new BMS control panels across the precinct. The project created a consistent, reliable building management platform across all buildings.

 



Location: Darwin, NT

Client: Defence

Sector: Defence

Completed: July 2025

Contract Value: $350,000


The Challenge

RAAF Darwin's Living-In Accommodation buildings were operating on an inconsistent and ageing building management system that no longer met Defence standards or accommodation requirements.

The project required complete BMS refurbishment across 40 buildings - a significant scope requiring careful coordination in an active Defence environment.

What TEC Delivered

TEC managed the full scope of the BMS refurbishment project, including:

  • System design and engineering

  • Supply and installation of new BMS infrastructure

  • Programming and commissioning works

  • Development of BMS control logic

  • Creation of new graphical interfaces

  • Installation and termination of BMS field sensors and control panels

A total of fourteen new BMS control panels were installed and integrated into a unified platform servicing the entire accommodation precinct.

The upgraded system was designed to improve reliability, simplify management, and support long-term operational performance across all buildings.

 

The Outcome

The project was delivered on time and within budget, with no safety incidents and no disruption to ongoing site operations.

The completed refurbishment delivered:

  • A consistent BMS platform across all 40 buildings

  • Improved system reliability and performance

  • Better energy efficiency outcomes

  • Enhanced occupant comfort and operational visibility

  • Compliance with Defence standards

The result was a modern, fully integrated building management system designed to support the long-term operational needs of the RAAF Darwin accommodation precinct.