Our projects reflect what we do best - delivering reliable automation solutions across the Northern Territory.
From Defence and water systems to industrial facilities and remote operations, we work in some of the NT’s most demanding environments where reliability, technical expertise and fast response matter most.
Every project is approached with practical problem solving, strong technical knowledge and a commitment to doing the job properly the first time - keeping critical systems running across the NT.
our recent
Projects
Pigeon Hole – Power & Water Corporation Control Panel Engineering
Power & Water needed three purpose-built control panels - a Sewage Pump Station panel and two bore control panels - engineered, built, tested, and delivered ready for integration into their live water infrastructure. TEC delivered the complete engineering package, from panel design and fabrication through to Factory Acceptance Testing and full documentation.
Crocosaurus Cove – PLC Platform Migration & HMI Upgrade
A follow-on engagement from their DDC upgrade, Crocosaurus Cove trusted TEC to migrate their full PLC system to the Beckhoff platform. TEC retained the original control intent while improving alarm management, system monitoring, and remote access - delivering a more capable, more maintainable controls environment.
Crocosaurus Cove – Air Conditioner DDC Replacement & HMI Modernisation
Darwin's iconic Crocosaurus Cove needed its ageing air conditioner control system replaced. TEC upgraded the full DDC platform, improved chiller sequencing logic, and delivered a new operator interface with modern graphics and fault diagnostics - giving the facility team better control, better visibility, and improved energy efficiency.
RAAF Darwin LIA Buildings BMS Refurbishment
Forty Defence accommodation buildings at RAAF Darwin needed a complete BMS overhaul. TEC designed, supplied, installed, programmed, and commissioned fourteen new BMS control panels - delivering a consistent, reliable building management platform across all buildings that meets Defence standards and supports long-term operational performance.
Nightcliff Shopping Centre Control System Upgrade
A Darwin shopping centre's central control system had become unreliable and difficult to manage. TEC delivered a complete assessment, redesigned the control system from the ground up, and commissioned a modern DDC controller with a clear graphical interface - giving the facility team full operational visibility and intuitive day-to-day control.